Corporate objectives for procurement
Contents |
[edit] Introduction
Procurement involves the purchase goods or services. It must be carefully managed to ensure value is obtained, the correct goods or services are purchased, a high level of quality is received, timescales are met and good relationships are maintained between the procurer and the supplier. Establishing a procurement strategy at the outset is key to a successful outcome.
[edit] Five objectives of corporate procurement
One approach to the corporate objectives for purchasing includes five basic principles. These are sometimes referred to the five Rs:
- Right quality
- Right quantities
- Right time
- Right price
- Right source
[edit] Right quality
The most appropriate items for a project may not always be the most expensive or the highest quality. Suitability is instead based on a combination of factors, including cost, characteristics and application requirements. These factors should be established by personnel who are knowledgeable in the business and technical aspects of the project and are able to verify the quality of items supplied.
[edit] Right quantity
Accurate purchasing can be based on a type of inventory management referred to as economic ordering quantity (EOQ). When calculated properly, the EOQ formula can help an organisation keep the size of an order at a minimum while still maintaining enough inventory to support the activities of the project.
|
[edit] Right time
The timing of purchases should be scheduled so materials are available - in the proper quantities and at the appropriate time. Inventory management methods should be put in place to trigger reordering based on historical data that tracks both material usage rates and necessary lead time (for delivery purposes). Since carrying excess inventory can be costly, it’s important to track this data closely and accurately.
[edit] Right price
The lowest bid isn’t always the most suitable bid for the project. However, every attempt should be made to negotiate a reasonable price based on specifications that have been carefully researched.
[edit] Right source
Selecting the most suitable vendor can not only contribute to a beneficial outcome, it can also help establish a self sustaining procurement strategy. Vendors can serve as partners who inform clients about possible factors - such as supply chain interruptions, pricing changes, additional potential partners and so on - that may have an impact on market conditions linked to the outcome of a project.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.